A Fire Alarm System That Can Be Heard Throughout the Facility. (Widespread)
Corrected: 12/03/2010
|
|
An Approved Installation, Maintenance and Testing Program for Fire Alarm Systems. (Isolated)
Corrected: 12/03/2010
|
|
Approved Construction Type or Materials. (Isolated)
Corrected: 12/03/2010
|
|
Automatic Sprinkler Systems That Have Been Maintained in Working Order. (Pattern)
Corrected: 12/03/2010
|
|
Construction That Can Resist Fire for One Hour or an Approved Fire Extinguishing System. (Isolated)
Corrected: 12/03/2010
|
|
Corridor and Hallway Doors That Block Smoke. (Pattern)
Corrected: 12/03/2010
|
|
Exits That Are Accessible at All Times. (Pattern)
Corrected: 12/03/2010
|
|
Heating and Ventilation Systems That Have Been Properly Installed According to the Manufacturer's Instructions. (Widespread)
Corrected: 12/03/2010
|
|
Properly Installed Electrical Wiring and Equipment. (Pattern)
Corrected: 12/03/2010
|
|
Record of Quarterly Fire Drills for Each Shift Under Varying Conditions. (Pattern)
Corrected: 12/03/2010
|
|
Smoke Barrier Doors That Can Resist Smoke for at Least 20 Minutes. (Pattern)
Corrected: 12/03/2010
|
|
Walls or Barriers That Prevent Smoke from Passing Through and Would Resist Fire for at Least One Hour. (Isolated)
Corrected: 12/03/2010
|
|
Weekly Inspections and Monthly Testing of Generators. (Isolated)
Corrected: 12/03/2010
|